12 Nov MILPARK HOSPITAL, JOHANNESBURG, GAUTENG
Featuring a new section added to the existing world class hospital offering and forming part of the Netcare Group, Netcare Milpark is a 346-bed hospital situated in Parktown, Johannesburg.
Netcare Milpark recently added an additional ICU section to the hospital, which in itself was a massive undertaking requiring unwavering commitment and dedication from the team that executed this project on time and without issues.
Hutz Hospi-Tec supplied Bedhead Service Systems in the form of HU10-01, HU19-01 and HU21-01 units, HU5-FT2 Pendant Service Systems and HU12 Theatre Control Panels.
“This was a hectic project with stringent timelines that needed to be met to ensure that handover was timeous. We worked together with a dedicated and professional team which allowed the Netcare Milpark project to flow with minimal hiccups and the project to be completed with a happy client at the end of the day,” commented Hutz Hospi-Tec’s Project Manager: Gauteng, Lindi Mostert.
Hutz Hospi-Tec is pleased to be associated with the following professionals on this project:
Main Contractor: WBHO – Atholl Norman
Architect: VDO Consulting cc – Ignatius Maree
Electrical Contractor: WAM Electrical – Mike Winik
Client: Netcare
Engineer: BFBA Johannesburg – Christopher Chemaly